The piling and foundations are completed on our Korat project. Today we pour ready mix concrete for the lower ring beam with some help from the crane and large concrete bucket.
The floor slab level will be 60 cm above ground, zero level (3 steps).
We will get the concrete slab and columns done before Songkran so that the concrete can cure during our holiday break.